Piling

Soil Investigation Marine

Rock Anchoring

Today we have completed more than 1000 projects of Major and Minor nature in the field of Geotechnical Engineering and we continue to grow in terms of turnover, size and the satisfied clientele list. Our ever increasing Clientele List and repeat work orders from existing clients are a testimony to our Quality Conscious Attitude, Timely Completion and Dedicated Efforts towards all projects of Major and Minor nature.

Experience
Projects Concluded
Satisfied Clients
Live Sites
Image

We at ZedGeo Systems believe that “Quality is never an accident, it is always an outcome of high intention, success, directed efforts, intelligence, determination and skillful execution. It represents the wise choice of many alternatives.”

Image

To create a fair and courteous atmosphere for clients, staff, vendors and the organization.

If you got any questions, please do not hesitate to send us a message. We reply within 24 hours!

ZedGeo Systems Pvt. Ltd.
37 A ,3rd Floor Kamat Industrial Estate
Veer Sawarkar Marg,
Opposite Siddhivinayak Temple,
Prabhadevi, Mumbai 400025.
Phone: +91 9821065636
Email: info@zedgeosystems.com / zedgeotech@yahoo.com
Effective Planning

Soil / Geotechnical Investigation

The primary objective, in Civil Engineering, while designing any structure like Dams, Bridges, Weirs, Buildings etc. is to determine the stratigraphy and pertinent physical properties of the soil and rock underlying the site

Effective Planning

Pile Foundation

The basic situation for a deep foundation is where suitable founding strata is not available near the usable portion of the structure at a relatively shallow depth. In such a case there arises a need to provide

Effective Planning

Rock Anchoring

Rock Anchors are usually proposed to resist the uplift force that might be induced on the foundations due to hydrostatic pressures, wind loads etc or to control the tilting or buckling of Piles / Diaphragm Walls in case

Effective Planning

Static Pile Load Test

Pile Load Tests are usually carried out for Major Infrastructure projects like Metro Rails, Flyovers, Elevated Roads, Bridges etc, before and during the execution stage of the project. They are of 3 types Vertical

Effective Planning

Micropiling

Micro-Piles are usually used for extension of existing buildings who have been granted FSI or TDR and also for projects where piling is to be executed with minimum vibration to the adjacent existing foundation.

Effective Planning

Drilling And Grouting

ZED carries out Drilling and Grouting works for major and minor water retaining structures like Dams, Weirs, Irrigations Tanks, Earthern Bunds and also for Soil Stabilisation works for improvement of Bearing Capacities

Some of Our Esteemed Projects:

Corporate Headquarters

Micropiling

Space Station

Drilling And Grouting

Our Clients

  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients
  • Clients